New – Booty Street (Contractor)

Starting Wednesday, March 28, and for one month, contractors will close Booty Street between Staples Street and Seventh Street for scheduled AEP utility work.

New – 3400 Block of Ayers Street (Contractor)

Starting Monday, April 2, and for one week, contractors will reduce southbound Ayers Street at the 3400 block of Ayers Street to one lane of traffic

New – Yorktown Boulevard (Bond 2014)

Starting Tuesday, April 3, and for the duration of the work, contractors will switch traffic to the eastbound lanes with one lane traffic in each direction between Lake Travis Drive and Everhart Road.  Other traffic impacts such as temporary lane closers are expected during this transition.

New – Lipan Street (SPMP)

Beginning Sunday, April 1 thru Saturday, April 7, weather permitting; contractors will be doing road work on Lipan Street from Staples Street to Upper Broadway.  During this period, either Lipan westbound or eastbound traffic will be reduced to one lane of traffic through the work site.

Booty Street (Contractors)

AEP contactors will be working on Booty Street from approximately 200’ east of the Staples Street intersection to S. Alameda Street. Work is scheduled to begin March 19 for approximately one month, weather permitting.  During this period, the following traffic control plan will be implemented:

  • Booty Street wil be closed between Staples Street and approximately 200’ east of the Staples Street intersection
  • Booty Street will be closed between S. Alameda street and 10th street.
  • S. Alameda Street will be closed from Booty Street to approximately 200’ north of Booty Street.

Motorists are requested to follow the detours signs around the work area.

Corona Drive (Bond 2014)

Starting Friday, March 9, the following traffic control plan will be implemented:

  • Corona Drive will be converted to ONE WAY traffic eastbound between Flynn Parkway and Everhart Road. Traffic will travel in one direction from Flynn Parkway to Everhart Road.
  • Tiger Lane will be closed between Oakhurst Drive and Flynn Parkway. A detour will guide motorists around the work zone.
  • Flynn Parkway will be closed between Corona Drive and Stonegate Way. A detour will guide motorists around the work zone.

Tuloso Road (Bond 2012)

Tuloso Road, between IH-37 and Leopard Street, is open to the public. However, there will daily lane shift were traffic will be narrowed and reduced to one lane in each direction.

Chaparral Street Phase 2 (Bond 2014)

Starting Monday, March 5, the following traffic control plan will be implemented:

  • Northbound Chaparral Street will be closed between Peoples Street and Starr Street and vehicular traffic will be detoured around the work zone.
  • Northbound Chaparral Street between Schatzell Street and Peoples Street will be open to traffic.

Holly Road (AEP Contractors)

Through March 31, there will be periodic lane closures on westbound Holly Road and at the major intersections.

Ocean Drive (Bond 2012)

The following traffic control plan is implemented for the Bond 2012 Ocean Drive project:

Ayers Street:

  • One lane on Ayers Street between Ocean Drive and Santa Fe Street will be open – westbound toward Santa Fe Street only. Southbound Ocean Drive traffic will be allowed to turn right on Ayers Street and northbound Ocean Drive traffic will have a dedicated left turn lane at Ayers Street. 
  • Second Street and Third Street approaching Ayers Street will remain open. Thru traffic and left turns will be allowed from Third Street.

Ocean Drive:

  • Southbound Ocean Drive traffic will be allowed to turn right on Ayers Street and northbound Ocean Drive traffic will have a dedicated left turn lane. 
  • Two-way traffic will remain open at Elizabeth Street. Northbound Ocean Drive traffic will not be allowed to turn left at Elizabeth Street.

Greenwood Drive (Bond 2012)

Horne Road and Gollihar Road will have various lane closures as road work continues.

Water Street 

The following traffic control plan is implemented until the project is completed:

  • Westbound Morgan Street will be closed at Santa Fe Street to Staples Street, and vehicular traffic will be detoured around the work zone.
  • Eastbound Morgan Street will be reduced to one lane from Staples Street to Seventh Street, will become two eastbound lanes of traffic from Seventh Street to Santa Fe street.  Vehicles will be allowed to cross the Morgan/Staples Street intersection with caution.

Elizabeth Street (Contractors)

There will be various lane closures on Elizabeth Street from Third Street to Ocean Drive. Throughout the various phases of this project, Elizabeth Street will be reduced to one lane of traffic in each direction through the work site.  Drivers are reminded this is still an active Hospital Zone.

Carroll Lane (Bond 2014)

Carroll Lane is reduced to one-way southbound traffic between Gollihar Road and McArdle Road.

Gollihar Road (Bond 2014)

City contractors are working on Gollihar Road between Staples Street and Kostoryz Road. Traffic is shifted onto the eastbound lanes with one lane in each direction.

McArdle Road (Bond 2012)

McArdle Road, between Arnold Drive and Nile Drive, is reduced to one lane. Flaggers will be on-site to assist motorists through the work zone.

After the first part is complete, McArdle Road will be open to two lanes of traffic in each direction from Arnold Drive to Nile Drive and reduced to one lane of traffic in each direction from Whittaker Drive to Arnold Drive.

Ayers Street (Bond 2014)

Eastbound Booty Street is closed at the Santa Fe Street intersection and the detour to Santa Fe Street will be through Ayers Street. At the same time, eastbound Ayers Street traffic is reduced to one lane at the intersection. Ayers Street will be closed to traffic on the east side of Santa Fe Street.  Northbound and southbound Santa Fe Street traffic will be reduced to one lane through the Ayers Street intersection. As of Thursday, July 20, the following temporary traffic control plan was implemented:

  • Santa Fe Street:  Northbound Santa Fe Street traffic is shifted onto the southbound lanes with one lane in each direction through the intersection.
  • Ayers Street:  Eastbound Ayers Street traffic approaching Santa Fe Street is reduced to one lane of traffic and left turns onto northbound Santa Fe Street will be permitted.  Eastbound Ayers Street is closed to traffic from Santa Fe Street to Ocean Drive. While at the same time, Ayers Street traffic is reduced to one lane and is a one-way from Ocean Drive to Santa Fe Street. Detour onto Ayers Street is from Ocean Drive, onto Del Mar Boulevard, onto Third Street to Ayers Street.
  • Second Street:  Access to Second Street is through Ocean Drive. Motorists exiting Second Street must turn left onto Ayers Street to Santa Fe Street.
  • Third Street: Third Street traffic approaching Ayers Street is reduced to one lane of traffic. Thru traffic and left turns are allowed from Third Street. 

Alameda Street (Bond 2012)

The following traffic control plan is implemented for the Alameda Street Improvement project:

Staples Street: Southbound Staples Street traffic is reduced to one lane approaching the Six Points intersection. 

Alameda Street: Traffic on Alameda Street between Six Points and Louisiana Avenue is shifted onto the southbound lanes with one lane in each direction.  All side streets off Alameda Street will remain open to traffic. Northbound traffic approaching the Louisiana Avenue intersection is reduced to one lane.

For information related to all current and upcoming lane closures associated with the Harbor Bridge project, please visit http://www.harborbridgeproject.com/