Kostoryz Road Temporary Lane Closures

CORPUS CHRISTI, TX – The City of Corpus Christi Traffic Engineering office advises residents and businesses beginning Monday, October 21, 2019, the following traffic control plan will be implemented, weather permitting:

  • Sections of Kostoryz Road will be reduced to one lane, then shift to the center turn lane, at various locations between South Padre Island Drive and Holly Road.
  • Lane closures will begin on the southbound lanes of Kostoryz Road and move south towards Holly Road. Then, lane closures will switch to the northbound lanes and move north towards South Padre Island Drive.
  • Side streets intersecting at Kostoryz Road may experience short term temporary closures as construction progresses through the respective intersections. The lane closure will be done in sections of 500-feet to 1000-feet, on a daily basis and removed at the end of each day by 6:00 p.m.

The city reminds drivers to use caution and slow down when driving through the work zone. Motorists should expect delays during construction. For more information, please contact Traffic Engineering at 826-3547.