Utility Work Will Affect Up River Road Traffic

CORPUS CHRISTI, TEXAS – The City of Corpus Christi Traffic Engineering office advises residents on August 22, weather permitting, City contractors will be doing utility work on Up River Road between Dona Drive and Manchester Avenue. Up River Road will be reduced to one lane of traffic on this section of Up River Road and flaggers will be on site to assist motorists through the work site.

Traffic control devices will guide motorists through the construction site.  Motorists should expect delays and if possible, seek alternate routes or avoid the area. Access to local driveways will be maintained throughout the duration of the project.   

For more information, please contact Traffic Engineering at 826-3547.