Utility Work to affect Traffic at Southern Minerals Road and Up River Road

The City of Corpus Christi Traffic Engineering office advises residents beginning Monday, May 9 through Wednesday, May 25, 2016, weather permitting, contractors will be removing and replacing pipeline across both Southern Minerals Road and Up River Road near the intersection. During this period, contractors will reduce the worksite to one lane of traffic and have flaggers available to assist motorists through the work area.

Traffic control devices will guide motorists through the construction site. Motorists should expect delays and if possible seek alternate routes or avoid the area. Access to local driveways will be maintained throughout the duration of the project.   

For more information contact Traffic Engineering at (361) 826-3547.